High Pressure Seamless Boiler Power Station Finned Steel Tube in 12cr1movg 15crmog P11 P5

Get high-quality High Pressure Seamless Boiler Power Station Finned Steel Tubes in 12cr1movg, 15crmog, P11, and P5 from our factory. Shop now for reliable products!
Request a Quote

PRODUCTS DETAILS

Basic Info.

Model NO.
fin tube
Tube
Seamless or Welded as Per Request
Fins
Steel, Aluminum
Steel
Carbon Steel,Stainless Steel,Alloy Steel
Transport Package
Exporting Standard Package
Specification
Carbon steel Or stainless
Trademark
LUZHENG
Origin
China
HS Code
8404909000
Production Capacity
10000PCS Per Month

Product Description

Product Description:
China factory high pressure seamless boiler power station finned steel tube in 12Cr1MoVG 15CrMoG P11 P5
DESCRIPTION TUBE MATERIAL FIN MATERIAL TUBE SIZE
Extruded ,L-fin,G(Embedded) Fin tube

 
All Kind of Material can be applied Aluminum A1050,
A6061, A1100,
A1050,A1060,Copper C1100,C1220

12.70~50.8
High frequency Welded Finned
Tube H,HH
 
Carbon,Stainless  ,Alloy Carbon,Stainless  ,Alloy
12.7~160
Integral Copper&Copper Alloy
High Finned Tube
C12200,C11000,C70600 C12200,C11000,
C70600
15.88~22.23
Oval Finned Tube,STUD FIN TUBE Carbon ,Stainless ,Alloy Steel Tube Carbon,Alloy.stainless Steel Tube
  All SIZE
  Available
Low Fin Tube Carbon Steel,Stainless Steel,
Titanium,copper,brass,nickel
Alloy,etc.

---

9.52~40
Turbo-C Tube
Turbo-E Tube
Corrugated Tube All Kind of Material --- 6.35~40

Company Info:
We are specialized in steel tube and fin tube for more than 10 years and have rich experience. Our factories has professional technicians and engineers, professional testing equipment, rich experience in delivery. We have more than 10 years of cooperative customers.We have four production bases. For usual sizes,we have stock ,so we can make quick delivery.Guarantee the quality and quantity of products, and guarantee the delivery time. The annual production of steel pipe and pipe fittings is 300000 tons, the annual fin tube production is 2 million meters, and the annual air cooler production is 15000 sets.
High Pressure Seamless Boiler Power Station Finned Steel Tube in 12cr1movg 15crmog P11 P5

Production equipment:
High Pressure Seamless Boiler Power Station Finned Steel Tube in 12cr1movg 15crmog P11 P5


Testing Machine:
High Pressure Seamless Boiler Power Station Finned Steel Tube in 12cr1movg 15crmog P11 P5


Pipe Checking:

High Pressure Seamless Boiler Power Station Finned Steel Tube in 12cr1movg 15crmog P11 P5
High Pressure Seamless Boiler Power Station Finned Steel Tube in 12cr1movg 15crmog P11 P5


Package& Shipping:
High Pressure Seamless Boiler Power Station Finned Steel Tube in 12cr1movg 15crmog P11 P5

High Pressure Seamless Boiler Power Station Finned Steel Tube in 12cr1movg 15crmog P11 P5


Expo Show:
High Pressure Seamless Boiler Power Station Finned Steel Tube in 12cr1movg 15crmog P11 P5


Customer Visit:
High Pressure Seamless Boiler Power Station Finned Steel Tube in 12cr1movg 15crmog P11 P5
CERTIFICATE:
High Pressure Seamless Boiler Power Station Finned Steel Tube in 12cr1movg 15crmog P11 P5 High Pressure Seamless Boiler Power Station Finned Steel Tube in 12cr1movg 15crmog P11 P5 High Pressure Seamless Boiler Power Station Finned Steel Tube in 12cr1movg 15crmog P11 P5
FAQ:
1. Q: I haven't done business with you guys before,how can I trust your company?
    A: Our company has been in business of steel tube,fin tube for 9, almost 10 years, which is longer than most  of our fellow suppliers, we've been golden suppliers for years. What's more, we've got quite a lot authority certificates, for example, CE, ISO9001, made in china onsite check certificate. I hope those above will be persuasive enough.
2. Q: What is the minimum order?
    A: Yes, our company mainly deals with wholesale deals, but if you insist buying one piece, or you just need one piece, we would be very likely to make the MOQ as 1 piece for you though.
3.  Q: How can I get a sample to check your quality? How long can I get the sample?
    A: After price confirmed, FREE SAMPLE could be provided for your evaluation.
        After you confirm the sample details, the samples will be ready for delivery in 3-7days,and will be sent to you via express and arrive in 3-5days.
4. Q: What payment methods your company accept?
    A: We accept T/T, L/C, Western Union, Paypal.
5. Q: What's the shipment terms and delivery time of your company?
    A: FOB,CFR,CIF,15-60days
6. Q: Do you give any discount ?
    A: We'll surely try our best to help you get those by the best price and good service at the same time.
 
 
 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours