Basic Info.
Usage
Pipeline Transport, Boiler Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
Section Shape
Round
GB/T8162-2008
10, 20, 35, 45, 16mn, 12cr1MOV, .15CrMo
Transport Package
Exporting Standard Bundles.
Specification
OD from 1/2inch to 42inch
Trademark
luzheng
Origin
Shandong, China
HS Code
7304192000
Production Capacity
10000tons
Product Description
Product Description:
China factory Boiler Seamless Steel Pipe in BS3059 PT2 360 620-460 15crmog
Item | Details |
Type | Seamless |
Standard | ASTM A106.ASME SA106,API 5L ,ASTM A53 ,ASME SA53,DIN17175,DIN1629/DIN2448,ASTM A179,ASME SA179,ASTM A192,ASME SA192,ASTM A210,ASME SA210,ASTM A335 BS3059,BS3059 PART II GR.360,440,GR.620-460,GR.622-490,629-470 |
Grade | B,X42,X46,X52,X56,X60.ASME SA179,ASME SA192,ASME SA210 A1 C ASME SA335-P5,P9,P11,P12,P15,P21,P22,P23,P91,P92. ASME SA213-T2,T5,T9,T11,T12,T17,T21,T22,T23,T24,T36,T91,T92 DIN17175,ST35.8,ST45.8,17MN4,19MN5,15MO3,13CRMO44,10CRMO910,14MOV63 EN10216-1,.P195TR1,P195TR2,P235TR1,P235TR2,P265TR1,P265TR2. EN10216-2,P195GH,P235GH,P265GH,16MO3,25CRMO4 (TC1,TC2) GBT5310,20G.20MNG,25MNG,15MOG,20MOG,12CRMOG,15CRMOG, 12CR2MOG,12CR1MOVG, |
OD | 17.1-1422mm (3/8inch-56inch) |
WT | 1.5-100mm |
Length | 1-12.9m random length,or Fixed length( 5.8m,5.85m,6m.11.8m.12m) |
Min.Order quantity | We can accept 1 pcs/size if we have stock. |
Surface | ,Clear oil varnish.or self color |
Ends | Plain ends,Bevels. |
Payment term: | TT or LC |
Package | Bundles or loose |
Delivery time | Depends on the specific orders,normally 45days |
We are specialized in steel tube for more than 15years and have rich experience. Our factories has professional technicians and engineers, professional testing equipment, rich experience in delivery. We have more than 10 years of cooperative customers.We have four production bases. For usual sizes,we have stock ,so we can make quick delivery.Guarantee the quality and quantity of products, and guarantee the delivery time. The annual steel pipe production is 300000 tons.
Production equipment&Testing Machine:
1. Q: I haven't done business with you guys before,how can I trust your company?
A: Our company has been in the market for 15, almost 16 years, which is longer than most of our fellow suppliers, we've been golden suppliers for years. What's more, we've got quite a lot authority certificates, for example, CE, ISO9001, made in china onsite check certificate. I hope those above will be persuasive enough.
2. Q: What is the minimum order?
A: Yes, our company mainly deals with wholesale deals, but if you insist buying one piece, or you just need one piece, we would be very likely to make the MOQ as 1 piece for you though.
3. Q: How can I get a sample to check your quality? How long can I get the sample?
A: After price confirmed, FREE SAMPLE could be provided for your evaluation.
After you confirm the sample details, the samples will be ready for delivery in 3-7days,and will be sent to you via express and arrive in 3-5days.
4. Q: What payment methods your company accept?
A: We accept T/T, L/C, Western Union, Paypal.
5. Q: What's the shipment terms and delivery time of your company?
A: FOB,CFR,CIF,15-60days
6. Q: Do you give any discount ?
A: We'll surely try our best to help you get those by the best price and good service at the same time.
Welcome to visit us!