Basic Info.
Usage
Pipeline Transport, Boiler Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Special Purpose
Section Shape
Round
En10216
P195, P235, P265
Transport Package
Bundles
Specification
od 17-914mm
Trademark
luzheng
Origin
Shandong
Production Capacity
5000tons Per Month
Product Description
Product Description:
China Factory GB/T5310-2017 12cr1movg 15crmog High Pressure Seamless Steel Pipe for Power Station and Boiler
Company Info:
We are specialized in production of steel tube for more than 15 years and have rich experience. Our factories has professional technicians and engineers, professional testing equipment, rich experience in delivery. We have more than 10 years of cooperative customers.We have four production bases. For usual sizes,we have stock ,so we can make quick delivery.Guarantee the quality and quantity of products, and guarantee the delivery time. The annual steel pipe production is 300000 tons
Production equipment&Testing Machine: Package& Shipping: Expo Show&Customer Visit: FAQ:
1. Q: I haven't done business with you guys before,how can I trust your company?
A: Our company has been in production of steel pipes for 15, almost 16 years, which is longer than most of our fellow suppliers, we've been golden suppliers for years. What's more, we've got quite a lot authority certificates, for example, CE, ISO9001, made in china onsite check certificate. I hope those above will be persuasive enough.
2. Q: What is the minimum order?
A: Yes, our company mainly deals with wholesale deals, but if you insist buying one piece, or you just need one piece, we would be very likely to make the MOQ as 1 piece for you though.
3. Q: How can I get a sample to check your quality? How long can I get the sample?
A: After price confirmed, FREE SAMPLE could be provided for your evaluation.
After you confirm the sample details, the samples will be ready for delivery in 3-7days,and will be sent to you via express and arrive in 3-5days.
4. Q: What payment methods your company accept?
A: We accept T/T, L/C, Western Union, Paypal.
5. Q: What's the shipment terms and delivery time of your company?
A: FOB,CFR,CIF,15-60days
6. Q: Do you give any discount ?
A: We'll surely try our best to help you get those by the best price and good service at the same time.
Contact:Zhiwei Wu (Will Wu)
China Factory GB/T5310-2017 12cr1movg 15crmog High Pressure Seamless Steel Pipe for Power Station and Boiler
Item | Details |
Type | Seamless |
Standard | ASTM A106.ASME SA106,API 5L ,ASTM A53 ,ASME SA53,DIN17175,DIN1629/DIN2448,ASTM A179,ASME SA179,ASTM A192,ASME SA192,ASTM A210,ASME SA210,ASTM A335 BS3059,BS3059 PART II GR.360,440,GR.620-460,GR.622-490,629-470,EN10216 |
Grade | B,X42,X46,X52,X56,X60.ASME SA179,ASME SA192,ASME SA210 A1 C ASME SA335-P5,P9,P11,P12,P15,P21,P22,P23,P91,P92. ASME SA213-T2,T5,T9,T11,T12,T17,T21,T22,T23,T24,T36,T91,T92 DIN17175,ST35.8,ST45.8,17MN4,19MN5,15MO3,13CRMO44,10CRMO910,14MOV63 EN10216-1,.P195TR1,P195TR2,P235TR1,P235TR2,P265TR1,P265TR2. EN10216-2,P195GH,P235GH,P265GH,16MO3,25CRMO4 (TC1,TC2) GBT5310,20G.20MNG,25MNG,15MOG,20MOG,12CRMOG,15CRMOG, 12CR2MOG,12CR1MOVG, |
OD | 17.1-914mm |
WT | 1.5-100mm |
Length | 1-12.9m random length,or Fixed length( 5.8m,5.85m,6m.11.8m.12m) |
Min.Order quantity | We can accept 1 pcs/size if we have stock. |
Surface | Clear oil varnish.or self color |
Ends | Plain ends,Bevels. |
Payment term: | TT or LC |
Package | Bundles or loose |
Delivery time | Depends on the specific orders,normally 45days |
We are specialized in production of steel tube for more than 15 years and have rich experience. Our factories has professional technicians and engineers, professional testing equipment, rich experience in delivery. We have more than 10 years of cooperative customers.We have four production bases. For usual sizes,we have stock ,so we can make quick delivery.Guarantee the quality and quantity of products, and guarantee the delivery time. The annual steel pipe production is 300000 tons
Production equipment&Testing Machine:
1. Q: I haven't done business with you guys before,how can I trust your company?
A: Our company has been in production of steel pipes for 15, almost 16 years, which is longer than most of our fellow suppliers, we've been golden suppliers for years. What's more, we've got quite a lot authority certificates, for example, CE, ISO9001, made in china onsite check certificate. I hope those above will be persuasive enough.
2. Q: What is the minimum order?
A: Yes, our company mainly deals with wholesale deals, but if you insist buying one piece, or you just need one piece, we would be very likely to make the MOQ as 1 piece for you though.
3. Q: How can I get a sample to check your quality? How long can I get the sample?
A: After price confirmed, FREE SAMPLE could be provided for your evaluation.
After you confirm the sample details, the samples will be ready for delivery in 3-7days,and will be sent to you via express and arrive in 3-5days.
4. Q: What payment methods your company accept?
A: We accept T/T, L/C, Western Union, Paypal.
5. Q: What's the shipment terms and delivery time of your company?
A: FOB,CFR,CIF,15-60days
6. Q: Do you give any discount ?
A: We'll surely try our best to help you get those by the best price and good service at the same time.
Contact:Zhiwei Wu (Will Wu)