Construction Industry Stainless Steel Seamless Pipe for Water Project

Get high-quality stainless steel seamless pipes for your water project from our factory. Durable, corrosion-resistant, and reliable for construction.
Request a Quote

PRODUCTS DETAILS

  • Overview
  • Product Description
  • Detailed Photos
  • Company Profile
  • Certifications
  • Packaging & Shipping
  • Our Advantages
  • FAQ
Overview

Basic Info.

Usage
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
Section Shape
Round
Length
1-12m or as Customers Request
Surface
2b/Ba/No.4/8K/Sb/Hl/No.1
Alloy or Not
Non-Alloy
Tolerance
1%
Standard
BS, ASTM, JIS, GB
Application
Fluid Pipe, Gas Pipe, Oil Pipe, Structure Pipe
Processing Service
Welding, Punching, Cutting
Shape
Round; Square. Rectangular. or as Your Requirement
Sample
Samples for Free
Ends
1, Plain 2, Beveled 3, Thread with Coupling or Cap
MOQ
5 Tons
Delivery Time
Within 10days or as Your Request
Grade
201 304 304L 316 316L 2205 2507 310S
Types
Seamless Steel and Welded Steel Pipe
Shipment
by Bulk or Load Into 20FT / 40FT Containers
Transport Package
as Customer′s Request
Specification
DN15-DN1000(21.3-1016mm)
Trademark
PRIMEE
Origin
China

Product Description

 

Product Description

Stainless steel tube manufacturer 304 316 seamless welded ss pipe
Products Stainless Steel Pipe
Steel Material 200 Series: 201,202
300 Series: 301,304,304L,316,316L,316Ti,317L,321,309s,310s
400 Series: 409L,410,410s,420j1,420j2,430,444,441,436
Duplex Steel: 904L,2205,2507,2101,2520,2304
Surface Finished 2B/BA/NO.4/8K/SB/HL/NO.1
Alloy Or Not Non-Alloy
Diameter 6-2500mm(as required)
Thickness 0.3mm-150mm (as required)
Length 6.0m or customized
Technique Seamless/Welded
Pipe Ends Plain ends
Standard ASTM, JIS, EN,GB/T12771, GB/T19228 and etc.
Packing Standard seaworthy export packing
Delivery Time Usually within 10-45 days after receipt of advance payment

Detailed Photos

 
Construction Industry Stainless Steel Seamless Pipe for Water Project
Construction Industry Stainless Steel Seamless Pipe for Water Project
Construction Industry Stainless Steel Seamless Pipe for Water Project
Construction Industry Stainless Steel Seamless Pipe for Water Project


      Standard:  ASTM A312,ASTM A358,ASTM A790,ASTM A928,JIS G3459,JIS G3468,EN10217,etc
 

Company Profile

Construction Industry Stainless Steel Seamless Pipe for Water Project
Construction Industry Stainless Steel Seamless Pipe for Water Project


Construction Industry Stainless Steel Seamless Pipe for Water Project
Construction Industry Stainless Steel Seamless Pipe for Water Project

An international steel supplier

China Primee steel Group Limited is an international steel supplier since 2012 working worldwide. We provide vigorous performance, an imaginative approach and modern technology, which are the principles of our company's corporate structure.

Our various services include

In a surprisingly short time, we have grown from a small group of businessmen into a successful, stable and reliable Processing and trade company with a certain scale. Our service includes processing trading, logistics, finance, insurance and inspection etc.

You are important to us

In addition to processing steel plate, coil and pipe, we also work with the manufacturing giants of the industry as well as seriously doing business with new factories of different steel products. We have a broad and diverse database at our disposal on existing and potential customers and suppliers. All of them are important to us. Our agents throughout the world speak the local language which enables them to understand our business partners' needs and to offer goods and services that correspond to the maximum of their requirements.

OBJECTIVES
 
Our commitment is to be the partner of choice to customers in our market by always offering excellence and value in steel supply solutions.

VALUES
 
-Commitment: mutual trust with employees, customers, suppliers and stockholders.
-Accountability: of individuals, and departments, in performance, results and problem-solving.
-Professionalism: in hiring, nurturing and empowering talent to deliver results resourcefully and creatively.
-Profitability: building financial strength is the core of our long term growth and development plan in the interest of our customers, vendors, shareholders and partners. always offering excellence and value in steel supply solutions.

 

Certifications

 

Construction Industry Stainless Steel Seamless Pipe for Water Project

Packaging & Shipping

Construction Industry Stainless Steel Seamless Pipe for Water Project
Package:
in bundle,plastic bags,thin film,wooden pallet,standard seaworthy export packing or as customer demands
20ft GP:5898mm(Length)x2352mm(Width)x2393mm(High) 24-26CBM

40ft GP:12032mm(Length)x2352mm(Width)x2393mm(High) 54CBM

40ft HC:12032mm(Length)x2352mm(Width)x2698mm(High) 68CBM

 

Construction Industry Stainless Steel Seamless Pipe for Water Project
Construction Industry Stainless Steel Seamless Pipe for Water Project
 
Construction Industry Stainless Steel Seamless Pipe for Water Project
Construction Industry Stainless Steel Seamless Pipe for Water Project
Construction Industry Stainless Steel Seamless Pipe for Water Project

 




l

Our Advantages

Highly cost effective and timely delivery

China Primee steel Group Limited has own processing factory to control cost and quality. We manufactures products to international quality standards and caters to customer demands by ensuring timely delivery and providing exceptional service.

Primee quality control

1)Exquisite selection of raw material suppliers-100% incoming factory inspection.

2)Precise size control → high degree of equipment automation
3)Investment of new advanced equipment and continuous improvement of technologic process
4)Product traceability → quality management system support.


Full high quality services
 
Our professional team provide services ranging from production, packing,delivery,spirit of contract and after-sales services to one-on-one hand-holding and an almost 24 hours for customers.

Rich export experience

 
We have more than 10 years of rich export experience, and our products are sold all over the world. We aim to become gloabal steel engineers to supply a set of solution.
 

FAQ

1.Will you deliver the goods on time?

Yes,we promise to provide best quality products and delivery in time no matter if the price change lot or not, Honesty is our company's tenet.

2.How can I get your quotation as soon as possible?

The email and fax will be checked in 24 hours, meanwhile, the skype will be online in 24 hours Please tell us the order information about quantity, Specification(steel type, material, size )and destination port, you will get the latest price.

3.How about the sample if i need?

The sample will be offered for free if you need, but the freight will be covered by our customer. If we have cooperation, the
freight will be covered by our company.

4.How about the MOQ?

Generally, the trail order will be accepted.The MOQ can be confirmed according to the different products. For example, the MOQ of PPGI will be 10MT.

5.How about the delivery time?

Within 15-30days after receiving the deposit or L/C at sight. Of course, the detail will be confirmed by the quantity and the different products.

6.How to order?

Please send us your purchase order by email. Or you can ask us to send you a proforma invoice for your order. We need to know the following information for your order.

7.What is shipment terms?

1. Container ship  2. bulk ship  3. Train

8.Do you have English Mill Test Certificates?

Yes,that is what we give gurantee to our clients

9.Do you accept the third party inspection?

Yes,absolutely we accept.
Ful high quality servic

Prme Quality controlPrime Quality control

Prime Quality control

Prime Quality control

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours