ASTM A519 4140 4130 4340 Seamless Steel Pipe

Factory-direct ASTM A519 4140 4130 4340 seamless steel pipe. High-quality, reliable supply. Seamless for optimum strength and performance.
Request a Quote

PRODUCTS DETAILS

Basic Info.

Model NO.
4130 Seamless steel pipe
Special Use
Wear Resistant Steel, Mold Steel, Oil and Gas Machine
Application
Oil and Gas Machine
Od
21.3-1219mm
Wt
6-60mm
Length
5.8m, 6m, 11.8m
MOQ
1 Tons
Steel Grade
4130 4140
Transport Package
in Bundles or Wooden Box
Specification
21.3-1219mm
Trademark
JIADE
Origin
China
HS Code
7307930000
Production Capacity
5000tons

Product Description

Product name: ASTM 519 4130 4140 4340 alloy steel pipe for pipeline

Standards: ASTM A519

Place of origin: China (Mainland)

Outer diameter: 21-1030mm

Thickness: 6 - 60 mm

Length: 5.8m-12m or as required

Section shape: round

Certifications: ISO 9001:2008, SGS

Technique: hot rolled

Surface treatment: oil painting

Special pipe: thick wall pipe

Application: Hydraulic Pipe, liquid delivery, structure pipe, construction, oil gas pipe

ASTM A519 4140 4130 4340 Seamless Steel Pipe

 

 

Tests we apply to the tubes:

1. Chemical composition analysis

2. Mechanical properties (tensile strength, yield strength, elongation, hardness)

3. Technological test (flattening test, flaring test, bending test, hydraulic pressure test)

4. Surface quality detection

5. Eddy-current examination

6. Visual test

Applications:

1. Low and middle pressure fluid transportation pipeline

2. Casing pipe

3. Low and medium pressure boiler seamless steel pipe

4. High pressure boiler seamless steel pipe

5. Carbon seamless steel pipe for ship

6. Seamless steel pipe used in high pressure chemical fertilizer equipment

7. Petroleum and natural gas industry

8. Steel pipe for heat exchanger

9. Used for diesel engine

10. Chemical industry, building industry, environment industry and more

Delivery condition: hot rolled, annealed, normalized, quenched and tempered

Packaging:

1. Bundle packing

2. Beveled end or plain end or varnished as per buyer's required

3. Marking: as per customer's requests

4. Painting varnish coating on the pipe

5. Plastic caps at ends

Delivery lead-time: with 15-30 days after full payment received

Our services: third party inspection accepted such as SGS, BV

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours