Power Station High Pressure Seamless Alloy Steel Pipe T12 T23 T2 T5 T91 T92 ASME SA213 SA213m

Welcome to our factory! We specialize in manufacturing high-quality power station high pressure seamless alloy steel pipes such as T12, T23, T2, T5, T91, and T92, in compliance with ASME SA213 SA213m standards.
Request a Quote

PRODUCTS DETAILS

Basic Info.

Model NO.
steel tube
Usage
Pipeline Transport, Boiler Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Special Purpose
Section Shape
Round
En10216
P195, P235, P265
Transport Package
Bundles
Specification
od 17-914mm
Trademark
luzheng
Origin
Shandong
Production Capacity
5000tons Per Month

Product Description

Product Description:
China Factory Power Station High Pressure Seamless ALLOY Steel Pipe T12 T23 T2 T5 T91 T92 ASME SA213 SA213M
Item Details
Type Seamless
Standard ASTM A106.ASME SA106,API 5L ,ASTM A53 ,ASME SA53,DIN17175,DIN1629/DIN2448,ASTM A179,ASME SA179,ASTM A192,ASME SA192,ASTM A210,ASME SA210,ASTM A335 BS3059,BS3059 PART II GR.360,440,GR.620-460,GR.622-490,629-470
Grade B,X42,X46,X52,X56,X60.ASME SA179,ASME SA192,ASME SA210 A1 C
ASME SA335-P5,P9,P11,P12,P15,P21,P22,P23,P91,P92.
ASME SA213-T2,T5,T9,T11,T12,T17,T21,T22,T23,T24,T36,T91,T92
DIN17175,ST35.8,ST45.8,17MN4,19MN5,15MO3,13CRMO44,10CRMO910,14MOV63
EN10216-1,.P195TR1,P195TR2,P235TR1,P235TR2,P265TR1,P265TR2.
EN10216-2,P195GH,P235GH,P265GH,16MO3,25CRMO4 (TC1,TC2)
GBT5310,20G.20MNG,25MNG,15MOG,20MOG,12CRMOG,15CRMOG,
12CR2MOG,12CR1MOVG,
OD  17.1-914mm
WT 1.5-100mm 
Length 1-12.9m random length,or Fixed length( 5.8m,5.85m,6m.11.8m.12m)
Min.Order quantity We can accept 1 pcs/size if we have stock.
Surface ,Clear oil varnish.or self color
Ends Plain ends,Bevels.
Payment term: TT or LC
Package Bundles or loose
Delivery time Depends on the specific orders,normally 45days
Company Info:
We are specialized in production of steel tube for more than 15 years and have rich experience. Our factories has professional technicians and engineers, professional testing equipment, rich experience in delivery. We have more than 10 years of cooperative customers.We have four production bases. For usual sizes,we have stock ,so we can make quick delivery.Guarantee the quality and quantity of products, and guarantee the delivery time. The annual steel pipe production is 300000 tons
Production equipment&Testing Machine:
Power Station High Pressure Seamless Alloy Steel Pipe T12 T23 T2 T5 T91 T92 ASME SA213 SA213m
Power Station High Pressure Seamless Alloy Steel Pipe T12 T23 T2 T5 T91 T92 ASME SA213 SA213m
Package& Shipping:
Power Station High Pressure Seamless Alloy Steel Pipe T12 T23 T2 T5 T91 T92 ASME SA213 SA213m
Power Station High Pressure Seamless Alloy Steel Pipe T12 T23 T2 T5 T91 T92 ASME SA213 SA213m
Expo Show&Customer Visit:
Power Station High Pressure Seamless Alloy Steel Pipe T12 T23 T2 T5 T91 T92 ASME SA213 SA213m
Power Station High Pressure Seamless Alloy Steel Pipe T12 T23 T2 T5 T91 T92 ASME SA213 SA213m
FAQ:
1. Q: I haven't done business with you guys before,how can I trust your company?
    A: Our company has been in production of steel pipes for 15, almost 16 years, which is longer than most  of our fellow suppliers, we've been golden suppliers for years. What's more, we've got quite a lot authority certificates, for example, CE, ISO9001, made in china onsite check certificate. I hope those above will be persuasive enough.
2. Q: What is the minimum order?
    A: Yes, our company mainly deals with wholesale deals, but if you insist buying one piece, or you just need one piece, we would be very likely to make the MOQ as 1 piece for you though.
3. Q: How can I get a sample to check your quality? How long can I get the sample?
    A: After price confirmed, FREE SAMPLE could be provided for your evaluation.
        After you confirm the sample details, the samples will be ready for delivery in 3-7days,and will be sent to you via express and arrive in 3-5days.
4. Q: What payment methods your company accept?
    A: We accept T/T, L/C, Western Union, Paypal.
5. Q: What's the shipment terms and delivery time of your company?
    A: FOB,CFR,CIF,15-60days
6. Q: Do you give any discount ?
    A: We'll surely try our best to help you get those by the best price and good service at the same time.
Contact:Zhiwei Wu (Will Wu)
 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours