ASTM A335 P9 P11 P12 P22 P91 P92 Cold Drawn Seamless Boiler Alloy Steel Pipe

Manufacturing factory producing ASTM A335 P9 P11 P12 P22 P91 P92 Cold Drawn Seamless Boiler Alloy Steel Pipe. High-quality steel pipes for industrial use.
Request a Quote

PRODUCTS DETAILS

Basic Info.

Model NO.
CXBP-2
Steel Grade
Carbon Steel and Alloy Steel
NDT
U.T, Ect
Hydrostatic Test
Yes
Transport Package
Standard Export Packing
Specification
12.7*1.2-356*52
Trademark
OEM, Chengxin
Origin
Jiangsu, China
HS Code
7304311000
Production Capacity
72000 Tons/Year

Product Description

PART I: PRODUCT INTRODUCTION
1. Description: 
Boiler tube is a kind of carbon steel and alloy steel tubes used for pressure vessels like heat exchangers,super-heaters,and various kinds of boilers. In Chengxin,we supply cold drawn seamless steel tubes for pressure vessels with carbon steel gardes and alloy steel gardes. 
2. Commodity: ASTM A335 P9 cold drawn seamless boiler steel pipe
3. Standard specification&steel grade:
ASTM/ASME: ASTM A213 T5,T9,T11,T12,T22,T23,T91
ASTM A335 P1, P2, P5,P9,P11,P12,P22,P23,P91
DIN: DIN 17175 10CrMo910,12CrMo195,13CrMo44 
EN: EN 10216-2 16Mo3,10CrMo5-5,13CrMo4-5,
10CrMo9-10,11CrMo9-10,25CrMo4,    
4. Size range: 12.7mm*1.2mm-356mm*52mm
5. Manufacture method: Cold rolled, hydraulic cold drawn, hot rolled
6. Delivery condition: Normalized for carbon steel grade, normalized+tempered for alloy steel grades.
7. End finish: plain ends or bevelled ends.
8. Marking: as per request
9. Packing: in bundles tied with steel strips. Int&ext oil coating or varnish as per request. External packing by PVC bags and knit bags.

COLD DRAWN SEAMLESS BOILER STEEL TUBE - ASTM A213 T5
ASTM A335 P9 P11 P12 P22 P91 P92 Cold Drawn Seamless Boiler Alloy Steel Pipe

COLD DRAWN SEAMLESS BOILER STEEL TUBE - VARNISH:
ASTM A335 P9 P11 P12 P22 P91 P92 Cold Drawn Seamless Boiler Alloy Steel Pipe

COLD DRAWN SEAMLESS BOILER STEEL TUBE - STANDARD EXPORT PACKING:

ASTM A335 P9 P11 P12 P22 P91 P92 Cold Drawn Seamless Boiler Alloy Steel Pipe

PART II: FREQUENTLY ASKED QUESTIONS
1. MOQ:
3-5 tons/size for carbon steel grades, 10 tons/size for alloy steel grades. 
2. Delivery Time: Generally, our delivery time is around 30-60 days dependig on steel grades. 
3.  Warranty&Guarantee: Warranty&guarantee period is 6 months since we deliver the tubes, and we are not responsible for quality problem caused by wrong unloading or storage after shipment. We welcome customer's inspection before shipment. 
4. Payment Method: We accept payment method like T/T, L/C, or D/P, but it depends on our investigation about customers. We have a solution to evaluate the credit of customers from all over the world, and time and amount of D/P we can release is determined by the evaluation. 
5. Quality Control: Our quality control system covers raw material purchase, in-production stages, and final inspection. We purchase raw material from stable suppliers who are leading steel mills, and we inspect the raw material as per the specifications. During our production procedure, there is inspection and quality control in every stage. 

PART III: FACTORY FACILITIES
ASTM A335 P9 P11 P12 P22 P91 P92 Cold Drawn Seamless Boiler Alloy Steel Pipe
ASTM A335 P9 P11 P12 P22 P91 P92 Cold Drawn Seamless Boiler Alloy Steel Pipe
ASTM A335 P9 P11 P12 P22 P91 P92 Cold Drawn Seamless Boiler Alloy Steel Pipe
ASTM A335 P9 P11 P12 P22 P91 P92 Cold Drawn Seamless Boiler Alloy Steel Pipe
ASTM A335 P9 P11 P12 P22 P91 P92 Cold Drawn Seamless Boiler Alloy Steel Pipe
ASTM A335 P9 P11 P12 P22 P91 P92 Cold Drawn Seamless Boiler Alloy Steel Pipe
ASTM A335 P9 P11 P12 P22 P91 P92 Cold Drawn Seamless Boiler Alloy Steel Pipe

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours